The Oiled and Gassed Faction within the Editorial Waterboard achieved their Completion Certificate in connection with provision of each and every item of expense necessary to install steel pillars within embedded concrete stanchions immediately outside the Rheum Room, all in total conformance with the specification as pictured below.
Whence they shall demobilize the van after establishing that the level of construction expertise brought to this project by The Oiled and Gassed Faction is to rationalized planning what panty hose is to finger fucking.
The Oiled and Gassed Faction, Part I
Subscribe to:
Post Comments (Atom)
0 Comments:
Post a Comment